Envision Your Future. We'll Make It Happen.

Greenville Technical College Multiple Projects

Mavin was selected through a competitive bidding process to replace and update the elevators and connected areas in two separate buildings. The projects were procured separately and were completed while both buildings were occupied. The first project was completed with McMillan Pazdan Smith Architects and replaced an existing elevator serving two floors in Building 501 on campus. The second project was completed with Craig Gaulden Davis and replaced a four-story traction elevator in Building 120 which serves as the Allied Health building on campus. Both projects were completed with the Office of the State Engineer and delivered on schedule and within budget. Mavin personnel also renovated the Student Center on Campus.

Client: Greenville Technical College

Location: Greenville, SC

Contract Type: Lump Sum